{"id":827,"date":"2018-02-20T16:42:59","date_gmt":"2018-02-20T14:42:59","guid":{"rendered":"http:\/\/meriaura.kajahdus.fi\/meriaura-mukana-purkamassa-inkoon-hiilivoimalaa"},"modified":"2018-12-13T20:57:53","modified_gmt":"2018-12-13T18:57:53","slug":"meriaura-mukana-purkamassa-inkoon-hiilivoimalaa","status":"publish","type":"post","link":"https:\/\/meriaura.fi\/en\/meriaura-mukana-purkamassa-inkoon-hiilivoimalaa\/","title":{"rendered":"Meriaura participates in a major green act in Inkoo"},"content":{"rendered":"<p class=\"newsingress newsitemingress\">In 2016, Fortum decided to demolish the out-dated coal-fired power plant in Inkoo, and the first phase of the plan was put into action in 2017.<\/p>\n<p>The entire power plant should be gone by the end of 2019. Fortum\u2019s Recycling and Waste Solutions unit is in charge for the demolition project.<\/p>\n<p>The demolition is estimated to generate 230000 mts of various materials, which the company aims to recycle as much as possible. Fortum has sold spare parts to other operators and recycled parts to their other power plants. Part of the scrap metal will end up in Turkey for use as raw material for the steel industry.<\/p>\n<p>In February 2018, the first shipment of scrap metal took place in Inkoo when Meriaura\u2019s vessel Adele loaded a full cargo to Paldiski for further shipment to Turkey, for account of Cronimet Nordic.\u00a0 \u201cWe are thrilled to be a part of this\u201d, tells Jukkis Sutela, Business Development Manager at Meriaura.\u00a0 \u201cIt feels great to assist our partners Fortum and Cronimet to recycle valuable metals, conserve natural resources and decrease carbon footprint.\u00a0 Moreover, we at Meriaura consider it a green act to ship a coal-based power unit out of Finland. Coal is old-fashioned, dirty and environmentally unsustainable \u2013 we are glad to get rid of it. We are already strongly involved in shipments of various alternative fuels like recycled woodchips, supported by our EcoCoaster-concept.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-728\" src=\"http:\/\/meriaura.kajahdus.fi\/wp-content\/uploads\/2018\/11\/Fortum_Inkoo_14.2.2018_2.jpg\" alt=\"\" width=\"654\" height=\"436\" srcset=\"https:\/\/meriaura.fi\/wp-content\/uploads\/2018\/11\/Fortum_Inkoo_14.2.2018_2.jpg 654w, https:\/\/meriaura.fi\/wp-content\/uploads\/2018\/11\/Fortum_Inkoo_14.2.2018_2-300x200.jpg 300w\" sizes=\"auto, (max-width: 654px) 100vw, 654px\" \/><\/p>\n<p>In photo, the persons from left to right:<\/p>\n<p>Tanel Rambi (Fortum), Marko Vuorela (Fortum), Kristoffer Retva (Cronimet), Tero Holl\u00e4nder (Fortum), Jukkis Sutela (Meriaura).<\/p>\n<p>(photo by Riku Isohella\/Fortum)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2016, Fortum decided to demolish the out-dated coal-fired power plant in Inkoo, and the first phase of the plan was put into action in 2017. The entire power plant&#8230;<\/p>\n","protected":false},"author":1,"featured_media":729,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":{"0":"post-827","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-news"},"_links":{"self":[{"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/posts\/827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/comments?post=827"}],"version-history":[{"count":2,"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/posts\/827\/revisions"}],"predecessor-version":[{"id":895,"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/posts\/827\/revisions\/895"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/media\/729"}],"wp:attachment":[{"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/media?parent=827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/categories?post=827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meriaura.fi\/en\/wp-json\/wp\/v2\/tags?post=827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}